Aldershot, Hampshire · HMO conversion

One house.
Six en-suite rooms.

A complete HMO conversion at The Warren, delivered by House Manage and now let and managed by our team.

We stripped the house back and rebuilt it for a landlord client: six en-suite shower rooms, two kitchens, five in-room kitchenettes, new electrical and plumbing installations, and a full interior refurbishment.

Discuss a similar project →
Finished bedroom at The Warren with dining space and wall-mounted television
PROJECTThe Warren, Aldershot
PROGRAMMEFebruary–June 2024
PROJECT VALUE RANGE£100,000–£160,000 including VAT
CONTINUING SERVICELet and managed since 2024
The brief

A home rebuilt for shared living.

The property was vacant during the works. Old kitchens, bathrooms and the boiler were removed, along with chimney breasts supported as part of the structural work. New partitions, wiring and plumbing created the foundation for six en-suite rooms.

We coordinated plumbing, electrical work, carpentry, plastering, tiling, flooring and decoration through one project team. House Manage also managed the HMO licence application.

Scope of works
  • 6 en-suite shower rooms
  • 2 kitchens and 5 kitchenettes
  • Full rewire and room electricity meters
  • Fire alarm system and 8 fire doors
  • New flooring throughout
  • Full replastering and decoration
  • Room water-supply isolation valves
  • Supported chimney-breast removal
The transformation

From bare walls to finished rooms.

Bay-window room stripped to bare walls and floorboards
Before. The bay room during strip-out.
The completed bay-window bedroom with a kitchenette
After. A furnished room ready to let.
Kitchen units being installed against freshly plastered walls
During works. The kitchen installation in progress.
Completed communal kitchen with oven, hob, sink and extractor
Completed. The finished kitchen.
The finished details

Practical spaces, consistently finished.

Six rooms have their own en-suite shower rooms; five also have a kitchenette. Two full-size kitchens provide further cooking space.

One team, throughout

Built by us. Looked after by us.

01

Strip-out and preparation

Prepare the property, remove old installations and coordinate structural work.

02

Install and finish

Sequence the trades across shower rooms, kitchens and kitchenettes, followed by plastering, flooring and decoration.

03

Let and manage

Provide ongoing letting, property management and maintenance after the conversion.

Our management team now looks after the property, with repairs coordinated through the people who know the installations.

Planning an HMO conversion?

Tell us about your property, intended works and timeframe.

Talk to House Manage →

Download Case Study

Interested in our services to get more from your property?

Case Study Download

Please fill up the form to download the case study.